Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OGG.V ·

Osisko Development Announces Mineral Resource

Resource Estimates

NYSE | TSXV: ODV NEWS RELEASE

Page 1 of 10

OSISKO DEVELOPMENT ANNOUNCES MINERAL RESOURCE UPDATE FOR THE

TRIXIE DEPOSIT, TINTIC PROJECT

• Measured resources of 119,847 tonnes grading 27.36 grams per tonne (" g/t") gold ("Au")

and 61.73 g/t silver ("Ag"), for a total of 105,437 ounces ("oz") Au and 237,868 oz Ag.

• Indicated resources of 124,743 tonnes grading 11.17 g/t Au and 59.89 g/t Ag, for a total of

44,811 oz Au and 240,211 oz Ag.

• Inferred resources of 201,603 tonnes grading 7.80 g/t Au and 48.55 g/t Ag, for a total of

50,569 oz Au and 314,678 oz Ag.

Montreal, Québec, March 15, 202 4 – Osisko Development Corp. (NYSE: ODV, TSXV: ODV)

("Osisko Development " or the "Company") announces an updated mineral resource estimate

("MRE") for its 100% -owned underground Trixie deposit (the " 2024 Trixie MRE "), within the

Company's wider Tintic Project (" Tintic" or the " Tintic Project"), located in the historic East Tintic

Mining District in central Utah, U.S.A. The 2024 Trixie MRE incorporated an additional 1,674 underground

chip samples over 1,678 meters ("m") (5,507 feet ("ft")) of underground development, and 7,385 m of

drilling (24,229 ft) in 122 holes completed by the Company since the release of the initial Trixie MRE

(the "2023 Trixie MRE"), with an effective date of January 10, 2023.

Relative to the 2023 Trixie MRE, contained gold ounces in measured and indicated resources decreased

by 29% and inferred resources decreased by 79% primarily due to lower estimated grades that

incorporated an updated geologic model interpretation and conversion of inferred resources. Drill results

and underground mapping from the 2023 exploration program improved the knowledge of the extent

and distribution of mineralization , resulting in m odeling improvements to both mineralization and the

historical mine shape model.

Chris Lodder, President, stated, "The 2024 Trixie MRE incorporates changes to our interpretation of

the main mineralized structures and reflects better understanding of the structural controls of the

deposit and realistic mining parameters following our exploration and test mining work in 2023. To date

exploration and mining occurred on less than 10% of known mineralized structures in the west Tin tic

district and thus, we see significant precious metal potential at depth , on parallel structures to Trix ie,

along the Trixie and Sioux Ajax faults to the north and south, as well as around all historic high-grade

gold mines in the West Tintic District. These high-grade gold targets, combined with the copper-gold

porphyry potential where drilling is underway, and a large area of polymetallic carbonate replacement

potential, illustrate that we have only scratched the surface in understanding the overall metal

endowment potential of the Tintic district."

Table 1: 2024 Trixie MRE (all zones) – March 14, 2024

Classification Tonnes

(000's)

Au Grade

(g/t)

Contained

Gold

(000's oz)

Ag Grade

(g/t)

Contained

Silver

(000's oz)

Measured 120 27.36 105 61.73 238

Indicated 125 11.17 45 59.89 240

Measured and Indicated 245 19.11 150 60.80 478

Inferred 202 7.80 51 48.55 315

Notes (applicable to Tables 1, 2, and 3)

1. Effective date of the 2024 Trixie MRE is March 14, 2024.

Page 2 of 10

2. Each of Mr. William Lewis , P.Geo., of Micon International Limited and Alan J . San Martin, MAusIMM(CP), of Micon

International Limited (i) has reviewed and validated the 2024 Trixie MRE, (ii) is considered to be independent of the

Company for purposes of Section 1.5 of National Instrument 43 -101 – Standards of Disclosure for Mineral Projects ("NI

43-101"), and (iii) is a "qualified person" within the meaning of NI 43-101.

3. The mineral resources were estimated using the Canadian Institute of Mining (" CIM"), Metallurgy and Petroleum's " CIM

Definition Standards on Mineral Resources and Mineral Reserves" adopted by the CIM council.

4. Mineral resources are reported when they are within potentially mineable shapes derived from a stope optimizer algorithm,

assuming an underground longhole stoping mining method with stopes of 6.1 m x 6.1 m x minimum 1.5 m dimensions.

5. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

6. Geologic modelling was completed by Osisko Development modeling geologist Jody Laing, P.Geo, using Leapfrog Geo

software. The 2024 Trixie MRE was completed by Osisko Development chief resource geologist, Daniel Downton, P.Geo

using Datamine Studio RM 2.0 software. William Lewis and Alan J. San Martin of Micon International Limited independently

reviewed and validated the mineral resource model.

7. The estimate is reported for an underground mining scenario and with USD assumptions. The cut-off grade of 4.32 g/t Au

was calculated using a gold price of US $1,750/oz, a CAD:USD exchange rate of 1.3 0; total mining, processing and G&A

costs of US $168.04/imperial ton ; a refining cost of US $2.65/ounce; a combined royalty of 4.5 0%; and an average

metallurgical gold recovery of 80%.

8. The stope optimizer algorithm evaluated the resources based on a gold equivalent grade which incorporates the silver grade

estimate and assumes a silver price of US$23/oz and metallurgical silver recovery of 45%.

9. The 2024 Trixie MRE is comprised of six zones within the greater Trixie area: T2, T3, T4, Wild Cat, 40 Fault and 75-85.

10. Average bulk density values in the mineralized domains were assigned to the T2 (2.955 T/m3), T3 (2.638 T/m3), T4(2.618

T/m3), Wild Cat, and 40 Fault (2.621 T/m3), and 75-85 (2.617 T/m3) domains.

11. Inverse Distance Squared interpolation method was used with a parent block size of 1.2 m x 2.4 m x 2.4 m.

12. The Company intends to file a technical report (the "Technical Report") in respect of the 2024 Trixie MRE in accordance

with NI 43-101 on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Development's issuer profile

within 45 days of the date of this news release.

13. The 2024 Trixie MRE results are presented in -situ. Calculations used metric units (metres, tonnes, g/t). The number of

tonnes is rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.

14. Neither the Company nor Micon International Limited is aware of any known environmental, permitting, legal, title-related,

taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other

than disclosed in this news release.

15. Technical information in this news release differs from similar information made public by U.S. companies subject to the

reporting and disclosure requirements of the U.S. Securities and Exchange Commission. See below under "Cautionary

Statement to U.S. Investors".

TRIXIE MINERAL RESOURCE ESTIMATE

• The 2024 Trixie MRE comprises six mineralized zones within the greater Trixie deposit, including

T2, T3, T4, Wild Cat, 40 Fault and 75 -85 over a strike length of 530 m, a maximum width of

105 m and to a maximum depth of 195 m for the deposit and is 350 m from surface (see cross

section Figure 1). These dimensions are for the overall size of the mineralized zone structures ,

with the 2024 Trixie MRE blocks contained within a smaller 440 m strike length, 60 m total width

and 195 m depth footprint.

• Gold mineralization is associated with high sulphidation epithermal mineralization, structurally

controlled and hosted within the quartzites. Mineralization consists of native Au, and rare Au-Ag

rich telluride minerals with quartz and quartz-barite-sulphosalt stockwork veining.

• The T2 Zone is the highest-grade structure within the overall deposit. In 2023, a total of 4,637

oz were recovered from processing mineralized material with an overall feed grade of 35.61 g/t

Au. The 2023 drill program also converted ounces from inferred to indicated, and drilling at

depth indicated a transition from high -grade gold to anomalous copper , which prompted the

testing of the deep porphyry target at Trixie West.

• The T4 Zone envelops the T2, 40 fault, and Wild Cat domains. Within the T4 domain, there are

discrete sub -vertical high -grade gold structures, defined on multiple levels and sections.

However, these structures appear to be more discontinuous and less disseminated in the broader

area than had been previously estimated . In 2023, mapping and modeling modified the

interpretation from a stockwork to distinct high -grade structures. As a result, the model now

incorporates tight search parameters around these structures, increasing confidence within the

zone, while also including the quartz-barite-sulphosalt disseminated stockwork mineralization.

o A mineralized fault structure known as the 40 fault, is mapped over 230 m strike

length and 80 m at depth and is about 1 m wide. This fault is a mineralized domain

within the T4 and offsets vertically dipping epithermal Au-Ag structures.

Page 3 of 10

o The Wildcat domain, a discrete structure within the T4, is steeply dipping to the east

and strikes for 237 m and terminates at the 40 fault.

o The T1 Zone, previously described in the 2023 Trixie MRE, has been incorporated into

the T4 Zone. The T1 Zone was previously an envelope on the contacts of both the 75 -

85 and T2 Zones. The T1 Zone had similar high-grade fissure zones as described in the

T4 Zone, that are constrained within the T4 envelope. Additional drilling in this area also

reduced the estimated contained gold above cut-off.

• The 75-85 Zone is a moderately west dipping silica sulphide cemented breccia zone. Drilling

along strike to the south suggests that the 75-85 Zone truncates both the T2 structure and T4

zone. Mine development in 2023 intersected previously unknown stopes within the modelled 75-

85 Zone and high-grade assays were less continuous at depth, although increasing down plunge.

Table 2: 2024 Trixie MRE Separated by Domain – March 14, 2024

Domain Category Tonnes Grade

(Au g/t)

Contained

Gold (oz)

Grade

(Ag g/t)

Contained

Silver (oz)

T2

Measured 22,678 106.27 77,484 115.99 84,572

Indicated 11,939 23.19 8,902 51.07 19,602

M+I 34,617 77.62 86,387 93.60 104,173

Inferred 1,996 9.82 630 61.38 3,938

T3

Measured 2,385 9.46 725 75.34 5,776

Indicated 970 5.47 171 57.32 1,787

M+I 3,355 8.30 896 70.13 7,564

Inferred 139 6.27 28 63.14 282

T4 +

Wild

Cat +

40 FLT

Measured 94,784 8.93 27,227 48.41 147,520

Indicated 51,827 6.48 10,795 37.59 62,637

M+I 146,611 8.07 38,023 44.58 210,156

Inferred 104,676 6.57 22,127 38.57 129,792

75-85

Measured - - -

Indicated 60,008 12.93 24,943 80.95 156,185

M+I 60,008 12.93 24,943 80.95 156,185

Inferred 94,793 9.12 27,784 59.28 180,666

Total

Measured 119,847 27.36 105,437 61.73 237,868

Indicated 124,743 11.17 44,811 59.89 240,211

M+I 244,590 19.11 150,248 60.80 478,078

Inferred 201,603 7.80 50,569 48.55 314,678

Refer to notes described under Table 1, which are also applicable to Table 2 in their entirety.

TRIXIE AND GREATER TINTIC CONCLUSIONS AND RECOMMENDATIONS

• In 2023, the Company completed a total of 6,028 m (19,776 ft) of underground drilling in 73

diamond drill holes at Trixie. Assays were finalized up to hole TRXU -DD-23-069 and were

included in the 2024 Trixie MRE.

• The new drilling, mapping and historical data compilation improved the interpretation and

revealed that there is significant potential for parallel high -grade gold fissure zones similar to

T2 and adjacent to the existing mine development. Much of the Trixie area remains unexplored.

• At Trixie, exploration potential remains highly prospective at depth near historical stopes that

ceased mining at the water table. The Trixie deposit remains open to the north, along strike of

Page 4 of 10

T2, down dip below the historical 756, down plunge to the Survey Vein and additional, parallel

structures are highly possible within the epithermal system.

• The Company continues to explore for additional high-sulphidation epithermal Au and Ag targets

along the 4 km strike length of historical mines and has identified at least a dozen new drill

ready targets from extensive data compilation and regional field work in 2023. Further work is

recommended to test these targets (see Figure 3 for property wide historical deposits and

exploration targets).

PORPHYRY TARGET DRILLING

• Copper-gold-molybdenum porphyry potential remains an exploration priority for the Company.

One diamond drill rig is currently active at surface testing a porphyry target at Big Hill and is at

a current depth of 1,180 m (3,872 ft). Assays are pending for this drillhole.

• One drill hole tested a copper-gold-porphyry target below Trixie and was drilled to a depth of

759.6 m (2,492 ft) when it crossed the Eureka Lily Fault to the east and out of the prospective

alteration zone. Further drill testing of a copper-gold porphyry target at depth below the Trixie

deposit is recommended to the west.

• The development of the 1,390 m decline ramp at Trixie, completed in September 2023,

significantly improving access to the underground workings for exploration development and

drilling beyond the 625 level.

• The Company has advanced rehabilitation at the 750 level to allow for further underground

diamond drilling to test for the down dip extent of the 756 zone and the porphyry target below

Trixie.

Page 5 of 10

Figure 1: Trixie geologic model and mineral domains cross section

Page 6 of 10

Figure 2: Exploration potential at Trixie

Page 7 of 10

Figure 3: Property wide mineralization and exploration targets

Table 3: Trixie MRE Cut-Off Grade ("COG") Sensitivity (Base Case in Bold) – March 14, 2024

Classification Tonnes COG Grade

(Au g/t)

Contained

Gold (oz)

Grade

(Ag g/t)

Contained

Silver (oz)

Measured +

Indicated

366,130 2.50 13.79 162,348 50.18 590,666

324,251 3.00 15.23 158,722 53.31 555,740

291,005 3.50 16.64 155,716 56.19 525,681

261,219 4.00 18.14 152,350 58.95 495,091

244,590 4.32 19.11 150,248 60.80 478,078

237,143 4.50 19.58 149,266 61.52 469,058

217,327 5.00 20.99 146,677 64.07 447,646

198,538 5.50 22.55 143,909 66.19 422,504

182,842 6.00 24.01 141,164 68.57 403,074

Page 8 of 10

165,955 6.50 25.81 137,734 71.39 380,902

152,986 7.00 27.55 135,503 74.34 365,663

Inferred

438,189 2.50 5.26 74,056 34.46 485,528

342,880 3.00 5.99 66,034 38.38 423,112

279,722 3.50 6.65 59,767 41.84 376,306

224,039 4.00 7.42 53,438 46.31 333,578

201,603 4.32 7.80 50,569 48.55 314,678

190,002 4.50 8.02 49,009 49.90 304,803

163,894 5.00 8.60 45,313 53.08 279,718

141,728 5.50 9.16 41,742 55.92 254,818

123,472 6.00 9.71 38,532 58.70 233,028

106,080 6.50 10.35 35,291 60.43 206,087

91,725 7.00 10.99 32,397 61.91 182,579

Note: Micon International Limited's QP has reviewed the COG used in the sensitivity analysis relating to the 2024 Trixie MRE and is

of the opinion that the individual cut -off grades used in the sensitivity analysis meet the test of reasonable prospects of economic

extraction. The numbers in bold represent the current 2024 Trixie MRE.

Table 4: Trixie MRE Cut-off Grade Calculation Breakdown

PARAMETERS VALUES

Mining Cost ($/ST) $74.33

G&A ($/ST) $52.71

Heap Leach ($/ST) $41.00

Total Refining Cost/ OZ $2.65

Gold Price $1,750

Royalty (Combination) 4.50%

Heap Leach Au Recovery 80.0%

Cut-off Grade (COG) 4.32

The cut-off grade for the 2024 Trixie MRE is 4.32 g/t Au compared to 4.85 g/t Au in the 2023 Trixie MRE

primarily due to the difference in the estimated cost of heap leach processing ($41/ST) relative to the

previously estimated mill processing scenario ($89/ST).

Qualified Persons

The scientific and technical information contained in this news release has been reviewed and approved

by Maggie Layman, P.Geo., Vice President, Exploration of Osisko Development, and a "qualified person"

within the meaning of NI 43-101.

The independent QPs for the 2024 Trixie MRE, within the meaning of NI 43-101, are William Lewis,

P.Geo. and Alan J. San Martin MAusIMM(CP) of Micon International Limited. Each QP is independent of

Osisko Development within the meaning of NI 43 -101 and has reviewed and approved the content in

this news release.

Quality Assurance (QA) – Quality Control (QC)

All drill core and exploration samples are dispatched to ALS Geochemistry or SGS Canada for offsite

sample preparation and analysis. Both labs are ISO/IEC 17025 certified, and ALS Geochemistry is also

ISO 9001 certified. Samples are assigned a unique sample ID. All geological and sampling information

is entered into a Datamine Fusion database. Core is sawn in half and half is sampled. Certified standards

and blanks are inserted into all sample dispatches. Samples are collected by Old Dominion

Transportation and dispatched to SGS Canada 's laboratory in Burnaby, British Columbia or ALS